Job Description

Job Description Job Description

Journeyman Electrician - Data Centers

Quality "Plus" Services

Pay:$38.00/hr
Per Diem:$14.00/hr
Overtime Available

Job Description

Quality "Plus" Services is hiring experienced Journeyman Electricians for heavy commercial data center projects. This is a long term opportunity working in fast paced, mission critical environments.

Responsibilities

  • Install and maintain electrical systems in data centers
  • Run and bend EMT, rigid, and IMC conduit
  • Install cable tray and pull/terminate conductors
  • Install and terminate switchgear, panels, transformers, UPS, PDUs, generators
  • Read blueprints, schematics, and one line diagrams
  • Follow NEC, OSHA, and site safety requirements
  • Work closely with foremen and project leadership

Requirements

  • Valid Journeyman Electrician License (or state equivalent)
  • 4+ years commercial or industrial electrical experience
  • Data center or large scale commercial experience preferred
  • Strong NEC knowledge
  • Ability to pass drug screen and background check
  • Reliable transportation

Preferred

  • Experience with A/B power systems
  • OSHA 10 or OSHA 30 certification
  • Secure/active data center experience

Benefits & Perks

  • $38.00/hour base pay
  • $14.00/hour per diem
  • Overtime opportunities
  • Long term project potential

Multiple project locations available
Immediate openings

Apply today to join Quality "Plus" Services!

Company Description QPS is a true multi-craft industrial contractor, providing the efficiency that comes from a single point of contact and allowing for tasks and projects to be carefully tracked and monitored and ensuring a timely and cost-effective completion that is measured in safety and quality of craftmanship. Company Description QPS is a true multi-craft industrial contractor, providing the efficiency that comes from a single point of contact and allowing for tasks and projects to be carefully tracked and monitored and ensuring a timely and cost-effective completion that is measured in safety and quality of craftmanship.

Salary

Not Specified

Location

Cedar Rapids Iowa United States

Job Overview
Job Posted:
3 weeks ago
Job Expires:
4w 2d
Job Type
Full Time
Education
Any
Experience
N/A
Vacancies
1

Share This Job:

  • Copy Link